期刊文献+

中国实验快堆非能动余热排出系统中非能动爆破片疲劳性能试验

Fatigue Experiment on Bursting Disk Device in Non-Active Heat Discharging System of Chinese Experimentation Fast Reactor
下载PDF
导出
摘要 非能动余热排出系统是保证试验快堆安全工作的重要措施,爆破片是一种非能动超压泄放装置。本文对反复加载的疲劳载荷作用下的爆破片动作性能进行了实验研究,载荷应力为80%爆破片标定爆破压力,载荷循环次数超过1×105,疲劳试验前后的爆破片动作压力差别小于1.5%,说明余热排出系统中选用的爆破片耐疲劳性能优异,可以稳定保证非能动余热排出系统的可靠工作。 Passive residual heat removal system is very important for faster reactors to ensure its safety. Bursting disk is one passive discharging device under over-pressure. Action performance of the bursting disk is carried out by adding fatigue loads repeatedly in this paper. The load stress is 80% of the nominal bursting pressure of the bursting disk, and the load cycles is over 10^5. The experimental result shows that the action pressure difference before and after the fatigue experiment of the bursting disk is less than 1.5%, which indicates that the fatigue resistance of the bursting disk for the passive residual heat removal system is excellent, and it can ensure the reliable work of the passive system.
出处 《核动力工程》 EI CAS CSCD 北大核心 2007年第4期101-103,共3页 Nuclear Power Engineering
关键词 中国试验快堆 余热排出系统 爆破片 疲劳试验 Chinese experimentation fast reactor, Residual heat removal system, Bursting disk, Fatigue experiment
  • 相关文献

参考文献4

二级参考文献9

  • 1李志义,丁信伟,贺匡国.隔离式安全阀——一种防超压安全泄放新技术[J].锅炉压力容器安全,1989,5(5):24-28. 被引量:4
  • 2马大园.中国实验快堆运行工况CEFR设计报告[R].北京:中国原子能科学研究院快堆工程部,2002..
  • 3Kani Y, Aizawa K. Safety Evaluation for the LMFBR Plant Using Probabilistic Risk Assessment Techniques:IAEA-SR-111/4[R]. Vienna:IAEA,1985.
  • 4田和春 马大园 晁志玉.中国实验快堆初步安全分析报告[R].北京:中国原子能科学研究院快堆工程部,2003..
  • 5GB/T9252--2001.气瓶疲劳试验方法[S].[S].,..
  • 6国家环境保护局,核电厂环境辐射防护规定(GB6249 86),1996年
  • 7赵仁恺,中国快堆技术的发展,1995年,86页
  • 8国家核安全局政策法规处编,核电厂安全导则HAF 0209,1992年
  • 9丁信伟,宋勇峰,喻建良,等.全开无碎片拱形双面刻槽金属爆破片装置[P].中国专利:93221314.6,1994.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部