摘要 南桥尾矿库2号初期坝的混凝土防渗心墙失效,坝基渗透破坏严重,坝体向下游倾斜,采用传统“刚性封堵”治理效果不佳,笔者运用水力反滤原理,采用“柔性封堵”工艺对2号初期坝进行抢险治理,取得较好效果。 Because the concrete antiseepage central core failed in the preliminary dam No. 2 of Nanqiao tailings pond, the severe seepage failure of dam foundation occurred and the dam body inclined downstream. The conventional "rigid blockage" process was used for the treatment of this dam, but the desired effect couldn't be achieved. Based on waterpower inverse filtering theory, the "flexible blockage" process is used for the emergency treatment of the preliminary dam No. 2 and better effect is acquired.
作者 沈楼燕
出处 《有色金属(矿山部分)》 2007年第4期47-48,共2页 NONFERROUS METALS(Mining Section)
关键词 渗透破坏 柔性封堵 反滤 seepage failure flexible blockage inverse filtering
  • 相关文献

参考文献4

  • 1原中国有色金属工业总公司,中华人民共和国建设部.ZBJ1-90选矿厂尾矿设施设计规范[S].北京:中国计划出版社 1991.
  • 2《尾矿设施设计参考资料》编写组.尾矿设施设计参考资料[M].北京:冶金工业出版社,1978.
  • 3沈楼燕.矿山尾矿库排洪系统的“柔性封堵”[J].有色金属(矿山部分),2002,54(6):43-45. 被引量:6
  • 4国家质量技术监督局,中华人民共和国建设部.GB50290-98土工合成材料应用技术规范[S].北京:中国计划出版社 1998.

二级参考文献2

  • 1沈楼燕,吴国高.江西铜业公司银山铅锌矿尾矿库排洪系统封堵方案设计说明书[R].南昌有色冶金设计研究院,1999
  • 2《尾矿设施设计参考资料》编写组.尾矿设施设计参考资料[R].1978

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部