期刊文献+

港口集装箱码头轮胎式龙门吊优化调度研究 被引量:5

Research on Rubber Tired Gantry Crane Scheduling of Port Container Terminal
下载PDF
导出
摘要 随着贸易全球化的到来,集装箱运输业飞速发展,港口集装箱码头受到越来越多的重视。轮胎式龙门吊体积大,作业效率低,该环节已经成为码头作业的瓶颈。提出了轮胎式龙门吊优化调度混合整数规划模型,研究了定量作业条件下的龙门吊优化调度问题,通过实际案例分析为码头管理者提供决策支持。 With the coming.of trade globalization, container transportation rapidly develops all over the world. Port container terminal is much more emphasized than before as a node of container transportation. At container terminal, rubber tired gantry crane has already been a bottleneck of terminal operation with its large volume and low efficiencies. This paper studies the rubber tired gantry crane scheduling of port container terminal in thequantitative operation condition by using proposed mixed integer programming (MIP) model, which gives decision support to terminal managers through case analysis.
出处 《中国工程科学》 2007年第8期47-51,共5页 Strategic Study of CAE
基金 国家"十五"科技攻关资助项目(2004BA205A29-1)
关键词 集装箱码头 堆场 轮胎式龙门吊 优化调度 container terminal yard rubber tired gantry crane (RTGC) scheduling
  • 相关文献

参考文献6

  • 1Zhang Chuqian,Wan Yat-wah,Liu Jiyin,et al.Dynamic crane deployment in container storage yards[J].Transportation Research Part B,2002,36:537-555
  • 2Ng W C,Mak K L.Yard crane scheduling in port container terminals[J].Applied Mathematical Modelling,2005,29:263 - 276
  • 3Murty K G,Liu Jiyin,Wan Yat-wah,et al.A decision support system for operations in a container terminal[J].Decision Support Systems,2005,39:309 -332
  • 4陶其钧.集装箱堆场机械选型配置研究[J].港口装卸,2002(1):1-6. 被引量:8
  • 5Ng W C.Crane scheduling in container yards with inter-crane interference[J].European Journal of Operational Research,2005,164:64 - 78
  • 6Linn R,Liu Ji-yin,Wan Yat-wah,et al.Rubber tired gantry crane deployment for container yard operation[J].Computers & Industrial Engineering,2003,45:429 - 442

二级参考文献1

  • 1陈戍源.集装箱码头业务管理.大连:大连海事大学出版社,1998

共引文献7

同被引文献38

  • 1李建忠.码头堆场龙门起重机动态配置优化模型[J].交通运输工程学报,2005,5(1):70-74. 被引量:7
  • 2韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. 被引量:24
  • 3LAI K, LAM K. A study of container yard equipment allocation strategy in Hong Kong [J]. International Journal of Modeling and Simulation, 1994, 14 (3) : 134 - 138.
  • 4GAMBARDELLA L M, RIZZOLI A E, ZAFFALON M. Simulation and planning of an intermodal container terminal, Simulation [J].Mendeley, 1998, 71(2): 107-116.
  • 5KIM K H, KIM K Y. An optimal routing algorithm for a transfer crane in port container terminals[J].Transportation Science, 1999, 33 (1):17- 33.
  • 6RICHARD L, ZHANG C Q. A heuristic for dynamic yard crane deployment in a container terminal [J]. IIE Transactions, 2000, 2 (12): 1- 12.
  • 7ZHANG C Q. Dynamic crane deployment in container storage yards[D]. Hong Kong : Hong Kong University of Science and Technology, 2000.
  • 8Chung Y G, Randhawa S U, McDowell E D. A simulation analysis for a transtainer-based container handling facility [ J]. Computers & Industrial Engineering, 1988, 14(2) : 113-125.
  • 9Kim K Y, Kim K H. A routing algorithm for a single transfer crane to load export containers onto a containership [ J ]. Com- puters & Industrial Engineering, 19971 33 ( 3-4 ) : 673- 676.
  • 10Kim K H, Kim K Y. An optimal routing algorithm for a transfer crane in port container terminals[ J]. Transportation Science, 1999, 33(1) : 17-33.

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部