摘要
本文针对目前MIS开发过程的各阶段中,未将总体方案分析作为一个独立的开发阶段列出,而引起对总体方案分析的不够重视,进而导致后续各开发阶段的工作效率降低,提出在MIS开发过程中,总体方案分析阶段作为一个独立的开发阶段存在的重要性,并较详尽地描述了这一阶段的工作内容和一些开发方法。
In the current MIS developments, the analysis of overall plan hasn't been listed as an independent stage. So the analysis of overall plan would be despised and the work efficiency of each follow-up developing stage would be reduced. That's why in this article the author put forward the importance of the existence of the analysis stage of overall plan as anind ependent developing stage. At the same time the author gave the details of the workingprogram and some developing methods in this stage.
出处
《管理工程学报》
CSSCI
1990年第1期59-64,共6页
Journal of Industrial Engineering and Engineering Management