2Shah R,Ward P T.Defining and developing measures of lean production[J].Journal of Operations Management,2007,25:785-805.
3Schonberger R J.World Class Manufacturing:the next decade[M].New York:Free Press,1996.
4Womack J P,Jones D T,Roos D.The machine that changed the world[M].New York:Harper Perennial,1990.
5Sakakibara S,Flynn B B,Schroeder R G.A framework and measurement instrument for just-in-time manufacturing[J].Production and Operations Management,1993,2 (3):177-194.
6Flynn B B,Sakakibara S,Schroeder R G.Relationship between JIT and TQM:practices and performance[J].Academy of Management,Journal 1995,38 (5):1325-1360.
7Sakakibara S,Flynn B B,Schroeder R G,et al.The impact of just-in-time manufacturing and its infrastructure on manufacturing performance[J].Management Science,1997,43 (9):1246-1257.
8Koufterous X A,Vonderembse M A.Developing measures of time based manufacturing[J].Journal of Operations management 1998,16 (1):21-41.
9McKone K E,Weiss E N.Total productive maintenance:bridging the gap between practices and research[J].Production and Operations Management,1999,7 (4):335-351.
10Cua K O,Mckone K E,Schroeder R G.Relationships between implementation of TQM,JIT,and TPM and manufacturing performance[J].Journal of Operations Management,2001,19 (2):675-694.