牛角坪特大桥2号墩薄壁、高墩施工技术 被引量:2

Construction Techniques for Thin-Wall and High-Rise Pier No.2 of Niujiaoping Bridge
下载PDF
导出
摘要 牛角坪特大桥2号主墩高98 m,除底部6 m、墩顶1.2 m范围为实体段外,其余部分均为空心薄壁结构,混凝土量15 222 m3。该墩身具有截面面积大、墩高、单次混凝土浇筑方量大以及混凝土级别高、泵送高度高等特点。介绍2号主墩墩身施工技术。 The main pier No. 2 of Niujiaoping Bridge is 98 m high and all parts of the pier are of hollow thin-wall structure with the exception that the parts of the 6-m height at the bottom and 2-m height at the top of the pier are of solid structure with total concrete volume of all the pier up to 15 222 m^3. The pier is characteristic of large cross section area, great height, massive concrete volume of one-time casting, high grade concrete and high concrete pumping altitude. In this paper, the construction techniques for the pier are dealt with.
作者 张剑啸
出处 《桥梁建设》 EI CSCD 北大核心 2007年第4期56-58,74,共4页 Bridge Construction
关键词 连续梁桥 薄壁高墩 桥梁施工 continuous girder bridge thin-wall and high-rise pier bridge construction
  • 相关文献

参考文献4

  • 1GBJ17-88.钢结构设计手册[S].[S].,..
  • 2TB10203-2002.铁路桥涵施工规范[S].[S].,..
  • 3TB 10210-2001,铁路混凝土和砌体工程施工规范[S].
  • 4铁建设[2005]157号,铁路混凝土结构耐久性设计暂行规定[S].

共引文献183

同被引文献13

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部