摘要 根据发电厂的运行特点,以发电成本最低为目标,建立了厂内单元机组间负荷优化分配的数学模型,并通过动态规划方法求出模型的最优解,获得各台机组的经济负荷分配方案。在此基础上,以单元机组中各类主要运行设备的状态综合评价结果为依据,对经济负荷分配方案进行调整,实现了具有经济性和安全性的负荷优化分配。 Based on operation features of thermal power plants, and taking optimal cost of power generation as the target, a mathematic model for optimal load despatch among block units in the power plant has been established, and optimal solution of the model being found through dynamic planning method, obtaining economic load despatch scheme of each block unit. On this basis, and adjusting method for economic load dispatch schemes based on comprehensive evaluation results for status of each main operating equipment in the block unit has been put forward, realizing load despatch under consideration of economic behavior and safety at the same time.
机构地区 华中科技大学
出处 《热力发电》 CAS 北大核心 2007年第7期1-4,共4页 Thermal Power Generation
关键词 发电厂 单元机组 负荷分配 状态评价 动态规划 power plant block unit load despatch status evaluation dynamic planning
  • 相关文献

参考文献8

二级参考文献9

  • 1国家电力公司发输电运营部.火力发电厂安全文明生产达标与创一流规定[M].北京:中国电力出版社,2000..
  • 2Ouyang Z,IEEE Trans Power Systems,1991年,6卷,3期,1203页
  • 3Hsu Y Y,IEEE Trans PWRS,1991年,6卷,3期
  • 4Lee F N,IEEE Trans PWRS Paper 91WM 180 0,1991年
  • 5Tong S K,IEEE Trans PWRS,1990年,5卷,1期
  • 6Pang C K,IEEE Trans Power Apparatus Systems,1981年,100卷,3期
  • 7Pang C K,IEEE Trans Power Apparatus Systems,1976年,95卷,4期
  • 8Post D L,Coppinger S S,Sheble G B.Application of auctions as a pricing mechanism for the interchange of electric power[J].IEEE Trans. on Power Systems,1995,10(3):1580-1584.
  • 9Huse E S,Wangensteen I,Faanes H H.Thermal power generation scheduling by simulated competition[J].IEEE Trans. on Power Systems,1999,14(2):472-477.

共引文献57

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部