摘要
文章从吊装机械选择、布置、负荷分配及净空计算入手,到垂直度、同步性、就位三大措施,描述了该工程锅炉大板梁的吊装方案。
The hoisting project of big-board bean is analysed according to the description of boiler from its selecting. designing, load distributing and calculation of net space of hoisting machine to the main measures which is verticality. synchronism and perching.
出处
《山西电力》
2007年第4期27-28,53,共3页
Shanxi Electric Power
关键词
大板梁
塔吊
履带吊
措施
big-board bean
tower crane
track erane
measure