摘要
The authors took the ETM+ multi-spectra data as the data information and correlation coefficient for each band and carried out their information volume statistics.According to certain criteria,the authors also determined the optimum band-combined image.The image clarity is improved by various enhancements and fusions method.Based on remote sensing geological interpretation in detail,the relationship between remote sensing geological characters and gold mine were analyzed systemically.Using all kinds of remote sensing structure information,combining other research data,the authors determined mainly ore-controlling ore structure.Several prospective areas of gold ores were determined and furthermore significant finding mine target areas was confirmed.
The authors took the ETM + multi-spectra data as the data information and correlation coefficient for each band and carried out their information volume statistics. According to certain criteria, the authors also determined the optimum band-combined image. The image clarity is improved by various enhancements and fusions method. Based on remote sensing geological interpretation in detail, the relationship between remote sens- ing geological characters and gold mine were analyzed systemically. Using all kinds of remote sensing structure information, combining other research data, the authors determined mainly ore-controlling ore structure. Several prospective areas of gold ores were determined and furthermore significant finding mine target areas was confirmed.
基金
Supported by Project of Land and Resources Department of Heilongjiang Province