期刊文献+

川维厂取水口泥沙淤积研究 被引量:4

Research on Suspended Sediment of Chuanwei Inlet
下载PDF
导出
摘要 采用二维水流泥沙数学模型建立贴体正交网格,对川维厂取水口河段在三峡成库后进行不同流量工况下的流场计算,运用一个水文系列年循环计算出成库后该河段的悬移质淤积过程、淤积量、淤积分布.分析计算结果得出:成库后工程河段断面流速减少;取水口位置水势未变,水面依然存在横比降;悬移质主要在两岸的回流区和缓流区成累计性淤积,淤积速率基本一致.着重分析了取水口位置的水流条件变化、淤积后的河演变化对正常取水的影响. The 2-D sediment mathematical model was adopted to build the sticking body orthogonal mesh. The fluid field of Chuanwei inlet project was calculated in different situation of discharge after the Three Georges Project running. After calculating the sediment silting process, siltation volume and the area of deposition of the project reach in circle way in a series of water year, the conclusion was drawn with the analyses of the calculation result: the velocity in a section near the project is cut down;the water situation near the inlet does not change and the lateral slope still exists; the accumulated suspend sedimentation mostly locates in the recirculation zone and the area of slack water, and the sediment accumulation rate is consistent. The changes of the water condition around the inlet and the influences on the running of inlet by the evolution of river bed are analyzed.
出处 《重庆交通大学学报(自然科学版)》 CAS 2007年第4期132-137,共6页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 取水口 泥沙淤积 悬移质 数学模型 sediment aggradation suspended sediment mathematical model
  • 相关文献

参考文献4

  • 1张启舜.明渠水流泥沙扩散过程的研究及其应用[J].泥沙研究,1980,.
  • 2余利仁.正交贴体坐标系的生成[J].河海大学学报,1988,17(5):78-85.
  • 3吴持恭.水力学(下册)[M].北京:高等教育出版社,1984..
  • 4[5]Papantions D E,Athanassiadias N A.International J.for Numerical Methods in Fluids[ J ].Fluids Engineering,1985,5:12-18.

共引文献24

同被引文献24

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部