落脚河水电站拱坝体形优化设计

Form Optimum Design for Arch Dam of Luojiaohe Hydropower Station
下载PDF
导出
摘要 落脚河水电站拦河大坝是一座外掺MgO不分横缝的拱坝,在施工图阶段通过对坝址地质条件深入细致的研究,将初步设计阶段的等厚水平拱圈优化为变厚的椭圆线形拱圈的双曲拱坝,在使坝体应力水平满足要求的前提下,节省了坝基开挖及坝体混凝土工程量。 The dam of Luojiaohe Hydropower Station is one without horizontal joint made of concrete with MgO. On the period of designing construction drawings constant-thickness horizontal arch in primarily design period was modified to different-thickness elliptic one after research on geologic conditions of dam site in details and optimum. The result not only met the requirement of stress, but also cut down the volume of the dam and excavating work.
出处 《贵州水力发电》 2007年第4期34-37,共4页 Guizhou Water Power
关键词 水工结构 拱坝体形 椭圆拱圈 优化设计 ADASO程序 落脚河水电站 hydraulic structure arch shape elliptic arch optimum design ADASO program Luojiaohe Hydropower Station
  • 相关文献

参考文献1

二级参考文献6

  • 1厉易生.拱圈线型优选[J].水利学报,1996,28(1):74-77. 被引量:9
  • 2厉易生.二次曲线拱坝及其体型优化模型[J].水利学报,1988,(7):27-31.
  • 3[3]水利电力部水利水电规划设计院.中国拱坝[M].北京:水利电力部电影图片社,1987.
  • 4[4]厉易生.江口拱坝体型优化报告[R].北京:中国水利水电科学研究院,2000.
  • 5[5]厉易生.江口椭圆拱坝体型优化[R].北京:中国水利水电科学研究院,2000.
  • 6厉易生.双目标优化的有效点集及拱坝双目标优化[J].水力发电,1998,24(11):10-14. 被引量:5