摘要
介绍一种大型组块的安装方式Floatover法。此种安装方式将安装的组块固定在驳船上,运输组块的驳船进入导管架,系泊稳定就位后通过驳船的升降设施将组块荷载转移到钢桩即可。探讨了Floatover安装和组块、导管架设计及驳船选择的关系。
This paper introduced a new kind of installation method of modules called floatover,which do not need heavy float crane,but with three steps;First fix the modules on the barge. Then barge enters jacket. When barge is moored,loads of modules are transferred to piles by lifts. And it finds that floatover installation closely relates to modules and jacket design and the choice of barge.
出处
《中国海洋平台》
2007年第4期39-43,共5页
China offshore Platform