介绍援外桥梁护岸工程,采用两钻一挖工艺,自制导板抓斗机架,设置液压自控系统完成厚0.8m、深17.8m、长105.2m钢筋混凝土地下连续墙基础施工实况。机具可在挖深20m内、土密实度N<30时适用。
This paper describes the construction features of a bridge site bank protection project in a “Foreign Aid Service”. By using the technology of “two drilling and one digging” and by means of self manufactured sheet guideing bucket frame and hydraulic automatic controlling system, an underground continuous reinforced concrete wall with a thickness of 0.8m, a depth of 17.8m and a length of 105.2 m was completed. This set of equippment is suitable for soils with density number N less than 30 and depth up to 20 m.
出处
《桥梁建设》
EI
CSCD
北大核心
1997年第2期71-77,共7页
Bridge Construction
关键词
桑布贡吉桥
地下连续墙
基础
护岸
工程施工
Sangbugongji(音译) Bridge, underground continuous wall, foundation, construction