桑布贡吉桥护岸地下连续墙基础施工 被引量:2

The Construction of an Under ground Continuous Wall Foundation at the Bridge site of “Sangbugongji Bridge”
下载PDF
导出
摘要 介绍援外桥梁护岸工程,采用两钻一挖工艺,自制导板抓斗机架,设置液压自控系统完成厚0.8m、深17.8m、长105.2m钢筋混凝土地下连续墙基础施工实况。机具可在挖深20m内、土密实度N<30时适用。 This paper describes the construction features of a bridge site bank protection project in a “Foreign Aid Service”. By using the technology of “two drilling and one digging” and by means of self manufactured sheet guideing bucket frame and hydraulic automatic controlling system, an underground continuous reinforced concrete wall with a thickness of 0.8m, a depth of 17.8m and a length of 105.2 m was completed. This set of equippment is suitable for soils with density number N less than 30 and depth up to 20 m.
作者 赵永文
出处 《桥梁建设》 EI CSCD 北大核心 1997年第2期71-77,共7页 Bridge Construction
关键词 桑布贡吉桥 地下连续墙 基础 护岸 工程施工 Sangbugongji(音译) Bridge, underground continuous wall, foundation, construction
  • 相关文献

同被引文献60

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部