摘要
在分析现场管桩施工的不同沉桩方式的基础上,通过层次分析法建立起影响管桩施工方案选择的指标体系,然后对各指标作经验或逻辑推理评语,经过模糊计算,达到模糊优化选择管桩施工方案的目的.
Based on analyzing different sink manners of pipe pile construction in position, the index system of influence on choosing pipe pile construction schemes is established by the hierarchy analysis method. The remark based on the experience and logical reasoning is made on the aim of fuzzy optimization choosing construction schemes.
出处
《昆明理工大学学报(理工版)》
2007年第4期48-52,共5页
Journal of Kunming University of Science and Technology(Natural Science Edition)
基金
某商品房设计与施工新工艺的研究(项目编号:KKK0200506110)
关键词
预应力混凝土管桩
沉桩
模糊综合评判
施工方案
层次分析法
prestressed concrete pipe pile
sink pile
fuzzy comprehensive assessment
construction schemes
ana-lytic hierarchy process