期刊文献+

方钢管混凝土穿芯螺栓-端板节点抗震性能试验研究(英文) 被引量:3

Study on the seismic behaviour of through-bolt-end plate moment connections for concrete-filled steel tube column
下载PDF
导出
摘要 对3个穿芯螺栓-端板连接节点试件进行了伪静力试验研究,研究了轴压比分别为0.20、0.25、0.30时节点的滞回性能、强度及刚度退化、延性性能、耗能性能及破坏特征.试验结果表明,试件的层间位移延性系数为2.38~2.45,弹性及弹塑性层间位移角分别为0.0140~0.0158rad、0.341~0.0377rad,能量耗散系数为2.567~3.820.节点试件均为梁端形成塑性铰而破坏,节点具有很好的强度、刚度、延性及耗能能力,满足现行抗震规范GB50011-2001的要求.提出了相关的设计及研究建议. A total of three experimental specimens of through-bolt-end plate beam-to-column connections consisting of concrete-filled square steel tube column and H-shaped beams have been tested under low-cyclic reversed loading to invesigate the hysteric behavior, the strength and stiffness degradation, the energy dissipation capacity and the failure modes. The only difference of all specimens was with the axial compression ratio. Experimental results show that the story drift ductility ratios reached 2.38-2.45, the elastic and elasto-plastic story angular drift reached 0. 0140-0. 0158 and 0. 0341 0. 0377rad respectively, and the energy dissipation ratios attained 2. 561-3. 820. The experimental results also demonstrate that all specimens developed plastic hinges at the end of beams and provided superior seismic resistance in strength, stiffness, ductility and energy dissipation capacity. These results indicate that the seismic resistance exceeds that specified in Chinese Code GB50011-2001. Additional antiseismic design and research recommendations are presented.
出处 《西安建筑科技大学学报(自然科学版)》 CSCD 北大核心 2007年第4期512-519,共8页 Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
基金 陕西省自然科学基金项目(2007E202)~~
关键词 方钢管混凝土 梁柱节点 穿芯螺栓-端板节点 抗震性能 concrete-filled square steel tube beam-to-column connection through bolt-end plate connection seismic behavior
  • 相关文献

参考文献8

  • 1HAN Lin-hai.Concrete filled steel tubular structure[M].Beijing:Science Press,2000.
  • 2HAN Lin-hai,YANG You-fu.Modern concrete filled steel tubular structural technology[M].Beijing:China Architecture & Building Press,2004.
  • 3KANATANI H,TABUCHI M,KAMBA T,et al.A Study on Concrete Filled RHS Column to H-beam Connections Fabricated With HT Bolts in Rigid Frames[C]//Proceedings of the First Composite Construction in Steel and Concrete Conference,Engineering Foundation,Henniker,New Hampshire,1987:614-635.
  • 4WU Lai-yun,CHUNG Lap-loi,TSAI Sheng-fu,ect.Seismic behavior of bolted beam-to-column connections for concrete filled steel tube[J].Journal of constructional steel research,2005 (61):1387-1410.
  • 5宗周红,林于东,陈慧文,葛继平,杨强跃.方钢管混凝土柱与钢梁连接节点的拟静力试验研究[J].建筑结构学报,2005,26(1):77-84. 被引量:66
  • 6TANG Jiu-ru.Seismic resistance of joints in reinforced concrete frames[M].Nanjing:Dongnan University Press,1999.
  • 7JGJ101-96,Specification of testing methods for earthquake resistant building[S].Beijing:China,1997.
  • 8GB50011-2001,Code for seismic design of building[S].Beijing:China,2001.

二级参考文献7

  • 1CECS159-2004.矩形钢管混凝土结构技术规程[S].[S].,..
  • 2FEDERICO M M. Moment resistant connections of steel frames in seismic areas-Design and reliability [M]. E & FN Spoon, 2000.
  • 3BEUTEL J, THAMBIRATNAM D, PERERA N. Cyclic behaviour of concrete filled steel tubular column to steel beam connections[J]. Engineering Structures, 2002, 24 (11):29-38.
  • 4RASSATI G A, LEON T T, NOES. Component modeling of partially restrained composite joints under cyclic and dynamic loading [J]. Journal of Structural Engineering,ASCE,2004, 130(2): 343-351.
  • 5RICLES J M, PENG S W, LU L W. Seismic behavior of composite concrete filled steel tube column-wide flange beam moment connections [J]. Journal of Structural Engineering, ASCE,2004, 130(2): 223 - 232.
  • 6陶忠,韩林海.方钢管混凝土压弯构件滞回性能的试验研究[J].地震工程与工程振动,2001,21(1):74-78. 被引量:17
  • 7吕西林,李学平,余勇.方钢管混凝土柱与钢梁连接的设计方法[J].同济大学学报(自然科学版),2002,30(1):1-5. 被引量:98

共引文献65

同被引文献19

  • 1周天华,郭彦利,卢林枫,何保康.方钢管混凝土柱-钢梁节点的非线性有限元分析[J].西安科技大学学报,2005,25(3):283-287. 被引量:18
  • 2曹宝珠,张耀春,余红军,许辉.薄壁钢管混凝土节点的试验研究与ANSYS有限元分析[J].吉林建筑工程学院学报,2007,24(2):1-4. 被引量:6
  • 3刘永健,周绪红,刘君平.矩形钢管混凝土K型节点受力性能试验[J].建筑科学与工程学报,2007,24(2):36-42. 被引量:34
  • 4叶武.方钢管混凝土柱-削弱梁端的钢与混凝土组合梁框架节点受力性能研究[D],两安:长安大学,2006.
  • 5Scott L, Gary T Fry, Michael D Engelhardt. Experimental Evaluation of Cyclically Loaded Reduced Beam Section Moment Connections [J]. Journal of Structural Engineering. 2002,128(4) .441-450.
  • 6CHIEW S P,DAI C W. Experimental Study of Steel I-Beam to CFT Column Connections[J]. Advances in Steel Structures (ICASS '99), 1999 :291-303.
  • 7陈曦 王湛.钢管混凝土框架节点的刚度研究.哈尔滨工业大学学报,2007,39(2):381-384.
  • 8WANG Jing-feng, HAN Lin-hai, BRIAN Uy. Behaviour of flush end plate joints to concrete-filled steel tubular columns[J]. Journal of Constructional Steel Research, 2009, 65(4) :925-939.
  • 9JGJ101-96.建筑抗震试验方法规程[S].[S].,..
  • 10GB50017-2003.钢结构设计规范[S].[S].,..

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部