摘要
人防工程是在建筑工程同步施工的状态下完成的,而过程控制所执行的验收标准和配套规范是不一样的,本文就如何同时执行两套并行的标准和规范,避免验收项目的遗漏和相互之间的矛盾冲突,提出了解决问题的办法和建议。
Civil air defense projects finished while building engineering is constructing simultaneously, however, the acceptance criteria and supporting standard of the process control is different. As for how to execute the two standards simultaneously and avoid some interferences between them or some pretermissions of acceptance items, solutions and suggestions is put forward in this paper.
出处
《工程质量》
2007年第9期26-29,共4页
Construction Quality
关键词
人防工程
质量检验
标准
探讨
civil air defense projects, quality testing, criteria, discussion