摘要
乌江流域自2004年梯级龙头洪家渡电站建成投产以后,其流域梯级电站群开始逐步形成,对于如何有效地实现流域梯级水电站的优化调度,提高经济效益,不断开拓电力市场,实现企业效益最大化成了乌江公司与电网调度部门积极探索解决的首要问题。本文通过对乌江流域梯级优化调度的开展以及运行方式加以探索论述,提出梯级优化调度需解决的一些问题,以便能为加快实现流域梯级电站优化调度的进程提供参考。
Since the Hongjiadu Hydropower Station was put into service in 2004,the cascaded hydroelectric stations in the Wujiang River Basin have been constructing.How to realize the optimum associated dis- patch and raise the economic benefit for these stations is the first important problem to be solved.Some proposals and issues are put forward to speed up the pace of realizing the optimum associated dispatch.
出处
《水电站机电技术》
2007年第4期66-71,共6页
Mechanical & Electrical Technique of Hydropower Station
关键词
梯级
优化调度
集控
cascade
optimum dispatch
centralized control