摘要
从设计阶段、招标投标阶段、施工阶段、竣工阶段等不同阶段深入地探讨了工程造价的成本管理与投资控制,以提高投资效益,促进工程造价全过程管理,从而提高我国工程造价管理的总体水平。
From design stage, bid invitation stage, construction stage, completion stage and other aspects engineering cost management and investment control are discussed in order to increase investment benefits and promote the application of whole procedure cost management and increase cost management level in our country.
出处
《山西建筑》
2007年第18期252-253,共2页
Shanxi Architecture
关键词
工程造价
管理
投资
全过程
engineering cost, management, investment, whole procedure