摘要
介绍了长岭隧道进口工区的施工情况,探讨了施工机械设备配置的原则及方案,详细介绍了为提高隧道的施工进度而组建的掘进、锚喷、衬砌三条作业线的机械设备选型及配套,从而保证施工生产工作顺利进行。
This paper introduces the construction in work area at the entrance of Changling tunnel, discusses the principle and scheme to allocate construction mechanical equipment, illustrates the selection and set forming of mechanical equipment in three operating lines as driving, anchoring and shotereting and lining which are set up to increase construction progress of tunnel, in order to guarantee smooth construction and production.
出处
《山西建筑》
2007年第18期329-330,共2页
Shanxi Architecture
关键词
隧道
机械设备
施工进度
tunnel, mechanical equipment, construction progress