摘要
介绍了多个施工层异步距异节拍流水施工的工期计算及进度计划表的绘制方法.
In this article,according to many years'pedagogic experience, the author summarizes the ways on computation of working time and drawing of gradation plan calendar multi-story running construction with different paces.
出处
《河北建筑工程学院学报》
CAS
2007年第3期9-10,共2页
Journal of Hebei Institute of Architecture and Civil Engineering
关键词
个施工层
异步距异节拍
工期计算
进度表绘制
multi-story construction
different paces
computation of working time
drawing of gradation calend