期刊文献+

面向瓶颈的半导体晶圆制造系统派工策略及参数优化 被引量:10

The Bottleneck-Oriented Dispatching Strategy and Parameter Optimization in Semiconductor Wafer Fabrication System
下载PDF
导出
摘要 针对半导体晶圆制造系统中瓶颈设备动态漂移的特性,提出一种动态瓶颈实时派工策略.它是根据瓶颈机台的实时信息做出决策,决策参数通过响应曲面法和期望函数法确定并优化.实例验证表明,该算法相对于其他两种派工策略,在产能、加工周期、方差和制品数量等4个指标上均有所改善. According to the characteristics of dynamic bottleneck in semiconductor wafer fabrication system (SWFS), a dynamic bottleneck real-time dispatching (DBRD) strategy was proposed. The DBRD makes decision according to the real-time information, and the decision parameters are determined and optimized by using response surface method and desirability function approach. The simulation results prove that the proposed DBRD strategy is superior to other two strategies on the mean and variance of cycle time, work in process and throughput.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2007年第8期1252-1257,共6页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(50475027) 高等学校博士学科点专项科研基金资助项目(20040248052) 国家863高技术研究发展计划资助项目(2006AA04Z128)
关键词 派工策略 响应曲面法 期望函数 半导体晶圆制造系统 dispatching strategy response surface method (RSM) desirability function semiconductor wafer fabrication system (SWFS)
  • 相关文献

参考文献9

  • 1Uzsoy R,Lee C Y,Martin-vega L A.A review of production planning and scheduling models in the semiconductor industry.Part Ⅱ:Shop-floor control[J].IIE Transactions,1994,26(5):44-55.
  • 2Wein L M.Scheduling semiconductor wafer fabrication[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(3):115-130.
  • 3Kumar P R.Scheduling semiconductor manufacturing plants[J].IEEE Control Systems Magazine,1994,14(6):33-40.
  • 4Glassey C R,Resende M G C.Closed loop job release control for VLSI circuit manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(3):36-46.
  • 5Nakata T,Matsui K,Miyake Y,et al.Dynamic bottleneck control in wide variety production factory[J].IEEE Transactions on Semiconductor Manufacturing,1999,12 (3):273-280.
  • 6Liu Hui-ran,Fung R Y K,Jiang Zhi-bin.Modeling of semiconductor wafer fabrication systems by extended object-oriented Petri nets[J].International Journal of Production Research,2005,43 (3):471-495.
  • 7NIST/SEMATECH.NIST/SEMATECH e-handbook of statistical methods[DB/OL].(2005-11-09)[2006-06-30].http://www.itl.nist.gov/div898/handbook/.
  • 8Harrington E C.The desirability function[J].Industrial Quality Control,1965,21 (10):494-498.
  • 9Derringer G C,Suich R.Simultaneous optimization of several response variables[J].Journal of Quality Technology,1980,12:214-219.

同被引文献154

引证文献10

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部