期刊文献+

论民航空管“九五”基础设施建设的若干问题

How to Carry out the Infrastructure Construction of ATC in the "9th 5-Year Plan" Period
原文传递
导出
摘要 During the " 9th 5-Year Plan" Period which is crucial to China’s ATC development, we should regard it as the basic mission and target that to promote the infrastructure construction, complete the ATC system and guarantee the flight safety. Thus, I made the following proposals to furtherly complete the widely allowed ATC Construction Plan of the "9th 5-Year Plan" Period determined by ATC Bureau of CAAC. During the ' 9th 5-Year Plan' Period which is crucial to China's ATC development, we should regard it as the basic mission and target that to promote the infrastructure construction, complete the ATC system and guarantee the flight safety. Thus, I made the following proposals to furtherly complete the widely allowed ATC Construction Plan of the '9th 5-Year Plan' Period determined by ATC Bureau of CAAC.
作者 周阿荣
机构地区 民航总局空管局
出处 《民航经济与技术》 1997年第5期23-25,共3页
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部