摘要
溢流面是过流的通道,承受着高速水流冲刷,是大坝的重要结构部位。皂市大坝溢流面宽度不规则,施工分区多,难度大。采用滑模与支模两种方式施工,从优化设计到科学施工,再加上严格的质量控制使溢流面混凝土施工质量满足设计要求。
Spillsurface is important part of dam and it is the flow channel, it is suffer high velocity of water flow, the spillsurface of Zao City width is various, there are many construction sites, and itis difficult to build. Slip mould and support mould are used for the project and qualified the concrete construction quality.
出处
《黑龙江水专学报》
2007年第3期62-64,共3页
Journal of Heilongjiang Hydraulic Engineering College