一种模糊项目调度问题的变宽Beam Search算法 被引量:1

Width-changeable Beam Search algorithm for fuzzy project scheduling
下载PDF
导出
摘要 具有弹性约束和模糊工期的项目调度问题是一类具有实际应用意义但难于解决的问题.传统BS(Beam Search)方法存在常数线宽大小影响求解效果的问题.本文建立了此类项目调度问题的模型,并将序优化理论思想与BS方法结合,提出一种通过计算和改变线宽,兼顾解的质量和求解速度的变宽BS调度算法.仿真计算结果表明,该算法能够在较短时间内得到满意的调度结果,适用于实际模糊项目调度决策. Project scheduling with flexible constraints and ill-known processing time is a practical but hard problem. In traditional Beam Search(BS) algorithms, constant beam-width could influence the quality of solution. A model of this category of scheduling problem is formulated in this paper. By combining traditional BS algorithm and OO(ordinal optimization) theory, a width-changeable BS algorithm, which balances the quality of solution with computing time, is presented. Experimental results show that this algorithm can obtain satisfactory solution in acceptable time and be applied to practical fuzzy projects.
作者 程序 吴澄
出处 《控制理论与应用》 EI CAS CSCD 北大核心 2007年第4期630-633,共4页 Control Theory & Applications
基金 国家重点基础研究计划(973计划)资助项目(2002CB312202).
关键词 项目调度 柔性约束 不确定工期 集束搜索 project scheduling flexible constraints Ill-known processing times beam search
  • 相关文献

参考文献12

  • 1HERROLEN W, REYCK B D, DEMEULEMEESTER E. Resourceconstrained project scheduling: a survey of recent developments[J].Computers & Operations Research, 1998, 25(4): 279 - 302.
  • 2WEGLARZ J. Project Scheduling: Recent Models, Algorithms and Applications[M]. Amsterdam, Netherlands: Kluwer Press, 1999.
  • 3BRUCKER P,DREXL A, MOHRING R, et al. Resource-constrained project scheduling: Notation, classification, models, and methods[J].European J of Operational Research, 1999, 112:3 - 41.
  • 4TSAI Y W, GEMMILL D D. Using tabu search to schedule activities of stochastic resource-constrained projects[J]. European J of Operational Research, 1998, 111:129 -141.
  • 5CHOI J, REALFF M J, LEE J H. Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application[J]. Computers and Chemical Engineering,2004, 28(6/7): 1039 - 1058.
  • 6CHANAS S, DUBOIS D, ZIELINSKI P. On the sure criticality of tasks in activity networks with imprecise durations[J]. IEEE Trans on Systems, Man and Cybernetics, 2002, 32(4): 393 - 407.
  • 7CHEN S M, CHANG T H. Finding multiple possible critical paths using fuzzy PERT[J]. IEEE Trans on Systems, Man and Cybernetics,2001, 31(6): 930 - 937.
  • 8HAPKE M, SLOWINSKI R. Fuzzy priority heuristics for project scheduling[J]. Fuzzy Sets and Systems, 1996, 83(3): 291 - 299.
  • 9WANG J. A fuzzy project scheduling approach to minimize schedule risk[J]. Fuzzy Sets and Systems, 2002, 17(2): 99 - 116.
  • 10HO Y C, SREENIVAS R S, VAKILI P. Ordinal optimization of discrete event dynamic systems[J]. Discrete Event Dynamic Systems(DEDS), 1992, 2(2): 61 - 88.

同被引文献15

  • 1刘士新.项目优化调度理论与方法[M].北京:机械工业出版社,2006.
  • 2HERROELEN W, REYCK B D, DEMEULEMEESTER E. Resource constrained project scheduling:a survey of recent de velopment[J]. Computers & Operations Research, 1998, 25 (4) :279-302.
  • 3CHEN S M, CHANG T H. Finding multiple possible critical paths using tuzzy PERT[J]. IEEN Transactions on Systems, Man and Cybernetics,2001,31(6):930-937.
  • 4HAPKE M, SLOWINSKI R. Fuzzy priority heuristics for project scheduling[J]. Fuzzy Sets and Systems, 1996,83(3) : 291-299.
  • 5WANG J. A fuzzy project scheduling approach to minimize schedule risk for product development [J]. Fuzzy Sets and Systems,2002,127(2):99-116.
  • 6WANG Bing, YANG Zhen. A particle swarm optimization al- gorithm for robust flow shop scheduling with fuzzy processing times[C]//Proceedings of the IEEE International Conference on Automation and Logistics(ICAL 2007). Washington, D. C. , USA:IEEE,2007:824-828.
  • 7WANG J. A fuzzy robust scheduling approach for producl de- velopmenl projects[J]. European Journal of Operational Re search,2004,152(1) :180-194.
  • 8DUBOIS D, PRADE H. Qualitative possibility theory and its applications to constraint satisfaction and decision under uncer tainty[J]. International Journal of Intelligent Systems, 1999, 14(1):45-61.
  • 9BLAZEWICZ J, LENSTRA J K, RINNOOY KAN A H G. Scheduling subject to resource constraints: classification and complexity[J]. Discrete Applied Mathematics, 1983,5(1):11-24.
  • 10OZDAMAR L, ALANYA E. Uncertainty modeling in soft ware development projects(with case study)[J]. Annals of Operations Research,2000,102(1/4) : 157-178.

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部