期刊文献+

高混凝土面板堆石坝设计与施工理念 被引量:17

Design and Construction Concepts of High Concrete Facing Rockfill Dam
下载PDF
导出
摘要 坝高233 m的水布垭面板堆石坝是目前已建的世界上最高的面板堆石坝,为有效解决工程中的若干技术难题,提高大坝的安全性和经济性,设计和施工中应用了很多新理念、新技术、新材料和新工艺,对此进行概括介绍,为高混凝土面板堆石坝这种坝型在设计、施工及安全监测等技术的进一步发展提供了有益的参考和借鉴。 The 233m high Shuibuya Concrete Facing Rocckfill Dam (CFRD) is the highest one of its kind ever built in the world so far. In order to solve numbers of key technical issues effectively and to improve the clam performance both in safe and economy, many new concepts, new technologies, new materials and new processes have been applied in its design, construction and safety monitoring, which are summarized in this paper to serve as a useful reference for further development in the design, construction and safety monitoring of CFRDs.
出处 《水力发电》 北大核心 2007年第8期5-9,18,共6页 Water Power
关键词 高坝 混凝土面板堆石坝 设计理念 施工理念 新技术 high dam CFRD design concept construction concept new technology
  • 相关文献

参考文献7

二级参考文献10

共引文献55

同被引文献105

引证文献17

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部