水布垭水电站科研工作简介

Introduction of Scientific Research for Shuibuya Hydropower Station
下载PDF
导出
摘要 水布垭水电站将以21世纪初建设的第一高面板堆石坝载入坝工史册。长江科学院作为水布垭水电站的主体科研单位围绕工程设计和建设过程中遇到的技术难题,进行了大量的科研工作,取得了许多创新成果。 The Shuibuya Hydropower Station will be recorded into the dam annals, as it is the highest concrete facing rockfill dam built in the early of 21 century. The Changjiang Academy of Sciences, as the main research unit of Shuibuya Hydropower Station, has made a number of scientific and technical researches on the technical difficult problems that encountered in the project design and construction processes and has gained many innovation achievements.
出处 《水力发电》 北大核心 2007年第8期49-52,63,共5页 Water Power
关键词 泄洪消能 面板堆石坝 软岩处理 高徒边坡 稳定性 科学研究 水布垭水电站 flood-releasing energy dissipation concrete facing roekfill dam treatment of soft foundation high-steep sideslope stability scientific research Shuibuya Hydropower Station