结合肃临公路工程的施工,介绍冲击压实技术的应用,得出对填方段路基冲碾补压6遍是合适的、补压效果也是明显的结论;同时论证了采用冲击式压路机对路基进行冲碾补压施工,可提高路堤的密实度与均匀性,减少工后沉降与差异沉降,提高路基整体稳定性及强度。
This paper introduces the application of the impact compaction technology combining with Sulin highway construction.It proves that it is right to shock and compact 6 times on the embankment roadbed,and effect is also obvious.It also validates that technology can raise the airtight solid and even degree of embankment,decrease the labor queen subsides and difference subsides,improve the roadbed overall stability and the intensity.