杨庄河炼化项目厂区堤防断面设计

Design of Dyke Cross Section for Flood Prevention of Yangzhuanhe Oil Refinery
下载PDF
导出
摘要 杨庄河炼化项目厂区堤防断面设计中,从厂区自身要求对坡式护岸和墙式护岸进行了初步的方案比较,又从墙体稳定和基底应力对墙式护岸中衡重式挡土墙、仰斜式挡土墙两种形式进行比较。 Design of dyke cross section for flood prevention of Yangzhuanhe oil refinery was conducted in consideration of the safety of refinery itself by comparison of schemes of retaining slope with retaining wall, and then in consideration of stability of retaining wall and stress of foundation by comparison of gravity wall with slope face wall.
作者 杜娟莉 DU Li - juan (Shaanxi Survey and Design Institute of Hydropower Engineering, MWR, Xi'an 710001, China)
出处 《西北水力发电》 2007年第4期25-27,共3页 Journal of Northwest Hydroelectric Power
关键词 坡式护岸 墙式护岸 衡重式 仰斜式 稳定渗流 slope bank retaining wall gravity wall slope face wall steady seepage