摘要
秦山核电厂在最近10年的运行中,结合国内外先进的堆芯燃料管理方法,并针对电厂的实际情况,对最初设计的换料方案进行了逐步改进,通过改变布料方式、提高燃料富集度等,加深了燃料的燃耗,实现了较好的经济效益。本文介绍了秦山核电厂最近10年来的堆芯燃料管理改进情况。
In the recent 10-year operation of Qinshan Nuclear Power Plant, the initial designed reloading strategy was improved step by step based on the operation experience and the advanced domestic and international in-core fuel management method. Higher burnup was achieved and more economic operation gained through the loading pattern improvement and the fuel enrichment increase. This article introduces the in-core fuel management strategy improvement of Qinshan Nuclear Power Plant in its recent 10-year operation.
出处
《核电工程与技术》
2007年第3期1-5,共5页
Nuclear Power Engineering and Technology
关键词
堆芯燃料管理
换料方案改进
燃耗
in-core fuel management
reloading pattern improvement
burnup