摘要
根据岩土工程勘察资料,结合设计、施工的实际情况,对南宁市区深基坑的主要岩土工程问题进行了分析,并提出了一些防治的措施。
On the basis of the data of geotechnical investigation in Nanning area, and combining it with the constructed situation, analyzed the mainly question of geotechnical engineering of a deep foundation ditch, and advanced several measurements of punishing.
出处
《城市勘测》
2007年第2期121-123,共3页
Urban Geotechnical Investigation & Surveying
关键词
深基坑
稳定性
隆起
突涌
防治措施
deep foundation ditch
stability
rise
well up
measurements of punishing