摘要
文章针对本钢1#高炉矿焦槽基础施工时对邻近的原有7#高炉F5转运站基础稳固造成影响,通过采用托换技术施工,即采用人工挖孔灌注桩上加托梁的方法对原有F5转运站基础进行了加固,解决这一施工难题,保证了新1#高炉基础施工的顺利进行。
The foundation of the transfer post F5 for the former blast furnace No. 7 has been impacted by the nearby construction work of the coke trough for the blast furnace Nol during its heavy repair. We have solved the difficult problem by using the replaceable technology, which reinforces the foundation with an additional support beam on casted piles.
出处
《辽宁科技学院学报》
2007年第3期14-15,共2页
Journal of Liaoning Institute of Science and Technology
关键词
基础
灌注桩
托换
Foundation
Casted piles