摘要
基于船体分道作业深入推进和管理精细化的需求,围绕分段作业分解、产品信息模型建模、船体零件编码、船体零件套料和分段装配图设计,研究和总结提出船体组立设计。按此设计模式开展船体生产设计,有助于推进船体分道作业。
Based on deep development of hull path divided building and lean management requirement, this paper puts forward hull assembly design mode focusing on block assembly procedure, product information model modeling, hull piece coding, hull piece nesting and block assembly drawing. This hull production design mode can improve hull path divided building efficiently.
出处
《上海造船》
2007年第3期48-51,共4页
Shanghai Shipbuilding
关键词
船体建造
编码
作业分解
组立设计
hullbuilding
coding
job decomposition
assembly design