摘要
通过张石高速公路东峪特大桥76m高墩的施工,介绍一种简单易行的翻模施工工艺,并阐述模板的设计及翻模施工关键技术措施。
With the construction of 76 m high-rise pier of Dongyu extra-long bridge of Zhang-Shi expressway, a simple construction technique of turnover formwork is introduced, the design of formwork and the key construction technique are expounded.
出处
《石家庄铁路职业技术学院学报》
2007年第3期17-21,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
高墩
翻模工艺
关键技术
high-rise pier
techniques of turnover formwork
key construction technique