期刊文献+

ZPW-2000A移频监测系统的解决方案

Solution of ZPW-2000A Frequency Shift Monitoring System
下载PDF
导出
摘要 在ZPW-2000A移频监测系统设计中,采用通信前置机+现场总线+100Mb/s以太网,构成分布式采集方式,解决了设备安装的问题,提高了系统的采集速率,增加了系统构成的灵活性。专门设计的采集盒,提高了信号采集的准确性和实时性,有利于进行专业化的开发和生产。 In the design of ZPW-2000A frequency shift monitor system, the distributed data acquisition system, which is composed of communication pre-processor, field bus and 100Mb/s Ethernet, solved the problems of equipment installation, improved the speed of data collection, and raised the flexibility of system constitution. The accuracy and realtimeness of signal collection was enhanced by using dedicated data collection box, which is propitious to professional development and production.
作者 王冈
出处 《铁道通信信号》 2007年第9期23-25,共3页 Railway Signalling & Communication
关键词 移频监测系统 解决方案 分布式采集 Frequency shift monitor system Solution Distributed date acquisition
  • 相关文献

参考文献2

  • 1铁道部.ZPW-2000系列无绝缘轨道电路技术条件.2006.
  • 2铁道部.铁路信号微机监测技术条件(运基信号[2006]317号).2006.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部