期刊文献+

EAST托卡马克中央定时系统的实现 被引量:3

Development of the central timing system on the EAST Tokamak
下载PDF
导出
摘要 中央定时系统是EAST托卡马克装置总控系统的重要组成部分,是总控系统对各子系统进行时序和触发控制的基础。本工作建立的EAST中央定时系统采用分布式的系统结构,可对32MHz的系统时钟信号进行0—65535的任意整数分频;能对系统触发进行延迟输出,最大的延迟时间为4294s、延迟的分辨率为1μs。该系统性能稳定,并已成功地投入到2006年9月EAST托卡马克装置的首轮正式物理放电实验中。 The central timing system is an important part of the central control system on the Experimental Advanced Superconducting Tokamak (EAST), and it is the base of the central control system to control the timing and trigger of every subsystem. Based on the distributed architecture, this project established a central timing system on the EAST Tokamak. The central timing system has the ability to divide the 32 MHz system clock with any integer from 0 to 65535, and it can delay the system trigger signal with the longest delay interval of 4294 s under 1 μs resolution. This timing system is stable and was used successfully in the first physics experiment of the EAST superconducting Tokamak in September 2006.
出处 《核技术》 EI CAS CSCD 北大核心 2007年第9期789-792,共4页 Nuclear Techniques
基金 国家自然科学基金(10475079和10675128)资助
关键词 托卡马克 分布式 中央定时 以太网 嵌入式 Tokamak, Distributed, Central timing, Ethernet, Embedded
  • 相关文献

参考文献7

  • 1Raupp G, Richter H, Aubanel C, et al. IEEE Trans Nucl Sci, 1992, 39:198-204.
  • 2Moulin D, Couturier B, Ducobu L, et al. IEEE Trans Nucl Sci, 2000, 47(2): 119-122.
  • 3Luo J R, Wang H Z, Ji Z S, et al. IEEE Trans Nucl Sci, 2002, 49(2): 496-500.
  • 4Kwon M, Choi I S, Choi J W, et al. Fusion Eng Des, 2004, 71:17-21.
  • 5王华,罗家融,李贵明,张明新.基于VXI总线的分布式中央定时触发系统[J].微计算机信息,2006(04S):10-12. 被引量:2
  • 6Fiber optic components cookbook, Agilent Technologies, http://www.av agotech.cn, 2006.
  • 7Ethernut Version 1.3 Hardware User's Manual, egnite Software GmbH, http://www.ethernut.de, 2004.

二级参考文献1

共引文献1

同被引文献12

  • 1万元熙,李建刚,翁佩德.First Engineering Commissioning of EAST Tokamak[J].Plasma Science and Technology,2006,8(3):253-254. 被引量:9
  • 2陈灼民,钱静,龙风,胡燕兰,吴浩.全超导托卡马克装置(EAST)的技术诊断系统[J].低温与超导,2007,35(2):93-95. 被引量:14
  • 3Luo J R. The design of the control system in the EAST tokamak [R]. The 4th General Scientific Assembly of Asia Plasma & Fusion Association on New Development of Plasma Physics and Fusion Technology, 2003 Oct. 13-16, Hangzhou, China.
  • 4Fu Peng. EAST pf coil & power supply [R]. The 4th General Scientific Assembly of Asia Plasma & Fusion Association (APFA), Hangzhou, 2003.
  • 5Bai Hongyu, Bi Yanfang, Wang Jingrong, et al. Design of 2kW/4K helium refrigerator for HT-7U [R]. The 4th General Scientific Assembly of Asia Plasma & Fusion Association (APFA), Hangzhou, 2003.
  • 6JI Zhenshan, WU Yichun, SUN Xiaoyang, et al. EAST integrated control system[J]. Fusion Engineering and Design, 2010, 85:509-514.
  • 7J.B.Lister,J.W.Farthing,M.Greenwald. The ITER CODAC conceptual design[J].Fusion Engineering and Design,2007.1167-1173.
  • 8Mikyung Park. Implementation and initial commissioning of KSTAR integrated control system[A].Inuyama,Japan,2007.
  • 9I.Yonekawa,Y.Kawamata,T.Totsuka. Current status and future prospects of the JT-60 Ucontrol system[J].Fusion Engineering and Design,2004,(1-4):11-15.
  • 10孙晓阳,罗家融,季振山,吴一纯.EAST安全巡检与联锁保护系统设计与实现[J].核技术,2008,31(4):293-297. 被引量:4

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部