摘要
以江西省南昌市新洪州商业区项目工程的桩基施工为例,介绍了大面积PHC桩锤击法的施工工艺和质量控制措施,并简要阐明设计和施工中应注意的主要事项。
Taking the piles construction of Xinhongzhou Business Centrer Project in Nanchang City of Jiangxi Province as an example, this paper introduces the construction technique and quality control measures of prestressed pipe pile with super high strength (PHC) constructed by hammer methods, and briefly gives the major points for attention in designs and construction.
出处
《石家庄铁道学院学报》
2007年第3期131-134,共4页
Journal of Shijiazhuang Railway Institute
关键词
PHC桩
工艺流程
质量控制
PHC piles
technique process
quality control