摘要
文章从模板工程专项施工方案编制及审核程序,施工方案设计要求,强度、稳定性的计算和验算,模板支撑系统的主要内容,施工准备和施工过程的检查和验收及模板拆除的条件等几方面对模板及支撑系统工程施工质量进行阐述。
In this paper, from drawing-up of mould plate special construction plan & examination procedure, design requirement, the strength, stability calculating, mould plate support system, check and acceptance of construction and mould plate dismantling conditions,etc., the discussion is made to the construction quality of the mould plate and mould plate support system.
出处
《江苏建材》
2007年第3期48-50,共3页
Jiangsu Building Materials
关键词
模板
模板支撑系统
施工
监理
mould plate
mould plate support system
supervis