摘要
通过实施改进冶炼工艺提高终点控制及优化溅渣护炉、保证补炉效果等措施,提高二炼钢厂50t转炉高炉龄状态下的护炉工作成效。
The protection effects of furnace under the conditions of high campaign life of 50t converter were improved by carrying out countermeasures, such as improving smelting process, enhancing end point control, optimizing slag-splashing effects. for protection of converter and ensuring the relining
关键词
炼钢
转炉
终点
溅渣护炉
高炉龄
炉型控制
Steelmaking Converter End Point Slag-splashing for Protection of Converter HighCampaign Life Furnace Profile Control