温福铁路琯头岭隧道下穿公路隧道施工技术 被引量:26

Construction Technology for Wenfu Railway Guantouling Tunnel under Crossing the Highway Tunnel
下载PDF
导出
摘要 温福铁路琯头岭隧道在DK280+950~281+100段下穿同三高速公路琯头岭隧道.将数值模拟结论作为制定施工方案的重要参考,通过计算确定分部开挖几何形状及钻爆方案,并将监控量测数据作为施工过程控制的第一手资料,确保铁路隧道下穿公路隧道得以顺利完成. The WenFu railroad Guantouling tunnel DK280 +950-281 + 100 is one under crossing the highway tunnel. On the basis of the value simulation conclusion the construction plan is set up. The geometry shape, excavation plan, branch and drill blasting plan are set up through the computation determination, taking the monitor survey data as the first harnd informaltion for the construction process control to guarantee the successful completinon of the railroad tunnel under crossing the highway tunnel.
作者 雷位冰
出处 《地下空间与工程学报》 CSCD 2007年第4期758-764,共7页 Chinese Journal of Underground Space and Engineering
关键词 铁路隧道下穿公路隧道 数值模拟 钻爆方案 监控量测 railway tunnel under crossing the highway tunnel simulation drill blasting plan monitor survey
  • 相关文献

参考文献5

二级参考文献6

  • 1李四平.岩石力学简明教程[M].中国矿业学院出版社,1986..
  • 2-.采矿手册[M].冶金工业出版社,1990..
  • 3刘艳青,铁道工程学报,1998年,增刊,273页
  • 4刘艳青,国际隧道与隧道工程,1997年,1期,56页
  • 5WB,公路隧道设计规范(JTJ0 26-90),1990年
  • 6WB,公路隧道勘测规程(JTJ0 63-85),1985年

共引文献208

同被引文献154

引证文献26

二级引证文献255

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部