摘要
介绍了传统网络计划的发展过程,指出了其在建筑工程施工进度计划编制方面存在的不足,根据模糊数学的基本原理建立了模糊网络模型,结合工程实例说明了模糊数学在工期索赔管理中的应用,对模糊持续期的确定提出了建议。
The development process of traditional network plan is introduced. Its shortages existed in preparing construction schedule of building engineering are pointed out. Based upon basic principle of fuzzy mathematics fuzzy network model is built. In addition, combined with construction example the application of fuzzy mathematics in management of working-day claims is elaborated. In the end suggestions are proposed to determine fuzzy duration.
出处
《山西建筑》
2007年第28期226-227,共2页
Shanxi Architecture
关键词
模糊数学
工期
索赔管理
fuzzy mathematics, time limit, claims management