期刊文献+

承包商如何应对工程量清单计价风险

How to deal with project amount listing price risks for the contractors
下载PDF
导出
摘要 针对工程量清单报价的优点,对承包商的风险进行了分析,并从复核工程量清单、研究招标文件、建立企业定额、善用投标报价技巧等方面提出了承包商的风险对策,探讨了承包商的索赔问题,以期投标单位在项目实施中加强管理和控制,从而提高综合效益。 According to the advantages of project amount listing quotation, it analyzes the risks of contractors. It also brings forward some risk protecting measures from many aspects such as project amount listing recheck, research of bidding documents, setting of enterprises quota and investing quotation skills. It also discusses the claiming problems of contractors, so as to strengthen the management and controlling of item execution of bidding companies, and also improve the integrated benefits.
作者 冯昌金
机构地区 海南
出处 《山西建筑》 2007年第28期268-269,共2页 Shanxi Architecture
关键词 工程量清单 承包商 工程变更 造价管理 project amount listing, contractors, project changes, cost management
  • 相关文献

参考文献2

  • 1GB50500-2003.建设工程工程量清单计价规范[S].[S].,..
  • 2张惠艳.浅议工程量清单计价.山西建筑,2006,32(6):111-112.

共引文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部