摘要
结合崖上村隧道施工工程概况,介绍了喷混凝土、锚杆、加设钢筋网、格栅钢架施作等各施工环节的施工技术,并对初期支护的施工工艺、技术参数等均做了详细阐述,以供同类工程参考。
Combined with general engineering condition of Yashangcun tunnel construction, the author introduces construction technologies of each construction link as shotcrete, anchor pile, adding reinforcement mat and construction of grid reinforcement, and illustrates construction technology and technical parameter of primary support, in order to offer a reference for similar engineering.
出处
《山西建筑》
2007年第28期324-325,共2页
Shanxi Architecture
关键词
隧道
复合式衬砌初期支护
钢筋网
锚杆
tunnel, primary support of composite lining, reinforcement mat, anchor pile