摘要
通过对临建工程施工总布局的合理规划,充分利用各种有利条件,布局紧凑、严密,加快了施工进度,取得较好的效益。
Dongba Hydropower Station construction progress is accelerated and favorable benefits are achieved thanks to a rational construction layout of temporary works and taking advantages of favorable conditions.
出处
《红水河》
2007年第3期21-25,共5页
Hongshui River