摘要
文章总结了SR系列止水材料及SR接缝防渗体系在洞巴面板坝二期混凝土面板垂直缝和趾板周边缝上的施工技术。
The application of SR waterproofing materials and SR joint seepage prevention system to second-stage concrete face vertical fracture and fractures around toe slab at the face rock-fill dam of Dongba Hydropower Station is reviewed in this paper.
出处
《红水河》
2007年第3期29-32,共4页
Hongshui River
关键词
面板坝
SR防渗体系
施工
质量控制
洞巴水电站
face rock-fill dam
SR seepage prevention system
construction
quality control
Dongba Hydropower Station