介绍洞巴水电站混凝土面板堆石坝料填筑施工方法及施工过程中遇到的问题和解决的方法。
Material placement method for concrete face rock-fill dam at Dongba Hydropower Station as well as relevant problems and solutions are studied in this paper.
出处
《红水河》
2007年第3期36-39,共4页
Hongshui River
关键词
面板堆石坝
挤压边墙
垫层料
洞巴水电站
face rock-fill dam
extrusion side wall
cushion material
Dongba Hydropower Station