摘要
针对"83"石油管线、二期铁路隧道口、二期边坡、商贸大厦等被保护目标,对武警部队承担的11#,12#泊位1标段、2标段以及港湾公司承担的2标段进行了爆破震动测试,共采集爆破地震数据867组(289点次),对爆破施工单位进行了技术指导,使得整个二期开山采石爆破施工处于有效的受控状态,在保护目标的前提下,保证了爆破施工正常有序地进行,为以后的复杂环境下重点爆破施工作业监控积累了丰富经验。
Aiming to protect "83" oil pipeline, secondary railway tunnel, side slope and business mansion, blasting vibration monitoring was carried out to measure blasting engineering. No. 1 bid segment, No.2 bid segment of Nos. 11 & 12 berths taken by armed police army and Harbor Company respectively, 867 suits of data (289 points) concerning explosive earthquake were collected to provide technical instruction for blasting units, which ensured effective control and prospective implementation of the Phase II Project, and provided rich experience for future monitoring of key explosion construction conducted under complicated environment.
出处
《水运工程》
北大核心
2007年第9期89-91,107,共4页
Port & Waterway Engineering
关键词
爆破
振动速度
监测
blasting
vibration velocity
monitoring