考虑工期成本时确定最优报价的方法 被引量:2

Method to determine optimum contract bid on consideration of time cost
下载PDF
导出
摘要 介绍了国外出现的"报价+工期+奖罚机制(incentive/disincentive)"的投标模式,并对其作必要的分析。要求投标者不仅要提供传统意义的项目施工成本报价,还要提供完成项目的建设工期,同时业主制定一个奖罚机制,以此达到既节约费用,又减少工期的目的。建议投标者在制定策略时,要对项目成本、工期和奖罚机制进行综合考虑,以此来确定合适的投标报价和工期。 In traditional invitation to tender,contractors are merely required to submit a bid price with a complete time specified by the owner. In order to improve investment effectiveness a number of owners require the contractors to submit both price and completion time. There is "A (cost) + B (time cost) + I/D (incentive/disincentive)"biding concept abroad,it is designed to shorten the total contract time by allowing each contractor to bid the number of days in which the work can be accomplished,in addition to the traditional cost bid. I/D are not only used to provide an incentive to the contractor for earlier completion, but also to provide a disincentive for ate completion of a project. Contractors are then presented with the problem of determining the best strategy of bid estimation, including construction cost ,time cost, and incentive/disincentive.
出处 《南阳师范学院学报》 CAS 2007年第9期75-77,共3页 Journal of Nanyang Normal University
关键词 工期成本 投标 综合标价 time cost bid total bid cost
  • 相关文献

参考文献3

二级参考文献6

  • 1何伯森.国际工程招标于投标[M].北京:中国水利电力出版社,1994..
  • 2Chapman C B (1979), Large Engineering Project Analysis,IEEE Trans Eng Management, EM-26,78-86.
  • 3Hayes R W, Perry J G and Thompson P A (1983), Management Contracting Construction Industry Research and Information Association.
  • 4Koutsoyiannis A (1982), Non-Price Decisions, The Firm in a Modem Context, Macmillan.
  • 5刘允延,马龙友.工程投标极限标价的计算方法[J].施工企业管理,1997(7):29-32. 被引量:1
  • 6杨赞锋,赵彪.AHP 法在评标决策中的应用[J].武汉水利电力大学(宜昌)学报,1998,20(2):82-85. 被引量:2

共引文献1

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部