期刊文献+

贵阳市后坝至氧气厂排洪隧洞进口竖井消能设计

The Inlet Design Of Eliminate Energy Silo in Flood Discharge Tunnel from Houba to Oxygen Factory in Guiyang City
下载PDF
导出
摘要 受地形及地表建筑物等因素的限制贵阳市后坝至氧气厂排洪隧洞进口消能工布置较为困难,经过多方案比较,设计采用进口竖井消能方式。通过水工模型试验进行修正,该工程技术可行、运行可靠、流态稳定。不仅解决工程难题,而且最大限度降低工程施工对地表建筑物的干扰,可供类似工程设计参考。 the inlet of eliminate energy in flood discharge tunnel from Houba to Oxygen Factory in Guiyang city is different to lay because of factors, such as landform and building. Through the contrast project,eliminate energy silo is adopted. With the test of hydraulic,the design is feasible, the design not only can give a reference for another kinsmanship but also can reduce the affect to the building on ground.
出处 《贵州工业大学学报(自然科学版)》 CAS 2007年第4期51-55,共5页 Journal of Guizhou University of Technology(Natural Science Edition)
基金 贵州省自然科学基金资助项目(20052110) 贵州省自然科学基金资助项目(20052107)
关键词 排洪隧洞 竖井消能 环形堰 防涡墩 水垫 flood discharge tunnel eliminate energy silo annular weir prevent whorl frusta water mat
  • 相关文献

参考文献3

  • 1武汉水利电力学院水力教研室.水力计算手册[M].北京:水利电利出版社,1983.
  • 2华北水利学院.水工设计手册(第六卷)-泄水与过坝建筑物[M].北京:水利电力出版社,1983.
  • 3SL253-2000.溢洪道设计规范[S].[S].,..

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部