摘要
大体积砼须采取相应技术措施妥善处理内外温差,合理解决温度应力并控制裂缝。介绍了在塔座施工中采取的温度控制措施、实施过程及效果,并结合实际观测数据对大体积砼施工通过外掺剂的使用,优化砼原材料,优化砼配合比等措施更好地掌握用山砂施工大体积砼。
For big cubage concretes construction, some relevant technical measures should be adopted to appropriately deal with the difference in temperatures inside and outside, so as to solve the problem of temperature stress and control the crevice. Firstly, in this essay, the writer introduces shortly the adopted temperature control measures in hold pedestal construction, the process of actualization, and the effect. Then, according to the practical observation data, the writer puts forward some other measures such as optimizing now concrete materials and the associated concrete proportion with the use of the additive, so as to better master the way of big cubage concretes construction with sand.
出处
《贵州工业大学学报(自然科学版)》
CAS
2007年第4期136-140,共5页
Journal of Guizhou University of Technology(Natural Science Edition)
关键词
承台
大体积砼
温度控制
hold pedestal
big cubage concretes
temperature control