马岭河特大桥承台温度控制方案 被引量:1

The Blue Print of Controlling the Temperature of the Eighth Hold Pedestal on Super Malinghe Bridge
下载PDF
导出
摘要 大体积砼须采取相应技术措施妥善处理内外温差,合理解决温度应力并控制裂缝。介绍了在塔座施工中采取的温度控制措施、实施过程及效果,并结合实际观测数据对大体积砼施工通过外掺剂的使用,优化砼原材料,优化砼配合比等措施更好地掌握用山砂施工大体积砼。 For big cubage concretes construction, some relevant technical measures should be adopted to appropriately deal with the difference in temperatures inside and outside, so as to solve the problem of temperature stress and control the crevice. Firstly, in this essay, the writer introduces shortly the adopted temperature control measures in hold pedestal construction, the process of actualization, and the effect. Then, according to the practical observation data, the writer puts forward some other measures such as optimizing now concrete materials and the associated concrete proportion with the use of the additive, so as to better master the way of big cubage concretes construction with sand.
作者 刘志勇
出处 《贵州工业大学学报(自然科学版)》 CAS 2007年第4期136-140,共5页 Journal of Guizhou University of Technology(Natural Science Edition)
关键词 承台 大体积砼 温度控制 hold pedestal big cubage concretes temperature control
  • 相关文献

参考文献4

  • 1JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 2周永兴 何兆益 邹毅松.路桥施工计算手册[M].北京:人民交通出版社,2001..
  • 3中国建筑学会混凝土外加剂应用技术专业委员会.聚羧酸系高性能减水剂及其应用技术[M].北京:机械工业出版社,2005.
  • 4王磊.马岭河特大桥8号承台温度控制方案[G].交通部公路科学研究院.

共引文献1793

同被引文献5

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部