关于铁路工程定额测定工作的思考 被引量:7

Thought on determination of railway engineering norms
下载PDF
导出
摘要 铁路工程定额测定工作是投资控制的基础,因此,要确保基础资料翔实可靠,调查测定实事求是,分析整理科学严密。铁路工程定额测定要在注重系统性、差异性、记实性原则的前提下,广泛选取施工条件,充分收集测定项目的工程概况及施工图资料、施工组织资料、施工条件、施工工艺等资料,并综合利用测时法、写实记录法、工作日写实法,详尽准确地记录测定项目的工料机消耗量。此文还提出定额测定工作要特别注意充分做好准备工作,统一测定工作的标准、"四新"技术工料机消耗量的特殊性及收集了解综合进度指标数据等。 The work of determining railway engineering norms forms the basis of investment control. It has therefore need to ensure that basic data are full and accrurate, investigation and determination are practical and re alistic and analysis and sorting out are scientific and close. On the premise of keepping the principle of attaching importance to systemization, differentiation and documentatin, the railway engineering norms should, based on extensively selecting construction conditions, sufficiently collecting data concerning general situation, working drawings, construction organization, construction conditions and construction technology of the project to be determined, fully and accurately keep a record of the consumption of labour, materials and machines by making a comprehensive use of chronometric method, realistically re- cording method and workingday realistic method. This article also points out that in the norm determination work, speical attention should be paid to sufficiency of the preparatory work, standardization of the determination work, special nature of consumption of labour, materials and machines of the “Four New′s” technology, acquisition and understanding of the comprehensive progress index, etc.
作者 王中和
出处 《铁路工程造价管理》 2007年第5期1-3,8,共4页 Railway Engineering Cost Management
关键词 铁路工程 定额测定 实事求是 测时法 写实记录法 工作日写实法 工料机消耗 Railway engineering norm determination pratical and realistic chronometric method realisticallyrecording method working- day realistic method consumption of labour, materials and machines
  • 相关文献

同被引文献27

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部